Maintenance Contract with Enor Chile
On April 2017, ACROMEX was awarded by Enor Chile for a scheduled maintenance contract and repair services for 3 years for the 44 MW Ujina Generation Plant, located at 4,400 m.s.m.m., of the Mining Company Dona Ines de Collahuasi and operated by EnorChile S.A.
The contract considers the scheduled maintenance of the entire plant that has 4 x Caterpillar Generators Model 12CM43C of 10.8 MW (ISO) and 2 x Generators Caterpillar Model 16CM43C of 13.9 MW (ISO) as well as their auxiliary equipment.
Acromex America LLC has successfully entered into a comprehensive three-year maintenance contract with EnoChile for the Ujina Power Plant, which is located at the strategically important Collahuasi Mine site. This partnership is primarily focused on ensuring optimal performance and reliability of the various power generation systems, which are critical for maintaining the mine's overall operational efficiency. Under the detailed terms of the agreement, Acromex will provide a range of regular maintenance services, including routine inspections, preventive maintenance measures, and prompt repairs as necessary, thereby significantly enhancing the longevity and reliability of the power plant’s essential infrastructure. This collaboration not only underscores Acromex's unwavering commitment to delivering high-quality service but also highlights its dedication to providing ongoing support within the mining sector.